A judge has shut down a case by Icon against Australia’s nuclear agency over the $27 million construction of a waste treatment plant at Lucas Heights, saying the dispute should be determined by an arbitrator despite the parties waiving pre-arbitration steps.
The structural engineer behind Sydney’s ill-fated Opal Tower can examine whether builder Icon Co has been indemnified for $31 million worth of damage which occurred in the 36-storey apartment block on Christmas Eve of 2018, a court has found.
Prefab concrete company Evolution Precast Systems failed to install reinforced concrete in Sydney’s ill-fated Opal Tower and knew about a prior failure with one of the building’s panels, engineer WSP Structures alleges in a cross-claim lobbed in a class action on behalf of residents of the tower.
The Full Federal Court has found that Liberty Mutual Insurance, but not QBE, is required to cover Icon Construction’s losses stemming from the Opal Tower disaster, which has caused the builder $31 million in losses.
Opal Tower builder Icon and structural engineer WSP Structures have been joined as defendants in a class action brought by property owners, who have also added a slew of consumer law claims to the complex proceedings.